Overage
Also called Overage charge, Overage fee, Excess usage
Definition
Quantity beyond what the base price already includes, billed at the overage rate.
How it works
A plan that includes 10,000 events or 50 seats bills the excess as overage. For volume products with a flat overage band, blocks beyond the included amount bill at the block price in arrears.
For seats, the overage quantity is the confirmed seats added after the period started. Seats still pending under seat confirmation days don't count until they become billable.
Formula
Overage charge = max(0, quantity used − included quantity) × overage rate
Quantity used is what was measured in the period, included quantity is what the base price already covers, and the overage rate is the contract's price per unit above it. When overage is sold in blocks, round the excess up to whole blocks and multiply by the block price.
Example
Example: Lattice API, an invented API company, sells a $500-a-month plan that includes 10,000 API calls, with overage at $0.04 a call (amounts in US dollars). In March a customer makes 13,250 calls. The overage is 13,250 − 10,000 = 3,250 calls, and 3,250 × $0.04 = $130, so the March invoice is $500 + $130 = $630.
If the same overage were sold in blocks of 1,000 calls at $35 a block, the 3,250 extra calls would round up to 4 blocks, or $140.